top of page

Steel Railings: Strength & Security That Seals the Deal (for Wood Balconies)

Updated: May 28

Q: Is there an advantage to installing steel balcony rail posts before the waterproofing membrane on a wood-framed building?


A: Absolutely! Installing steel railings before waterproofing can offer several benefits:


  • Secure and Code-Compliant Connection: Attaching the steel posts directly to the wood frame allows for a strong and secure connection, potentially simplifying compliance with building codes regarding railing stability.

  • Waterproofing Efficiency: With the posts already installed, the waterproofing contractor can meticulously seal around the base of each post, ensuring a watertight system around the crucial connection point. This might be easier to achieve compared to waterproofing after post installation.

  • Reduced Damage Risk: Since the steel posts are installed before concrete work, they're less susceptible to damage from other trades while waiting to be installed.

  • Improved Safety and OSHA Compliance: By prioritizing a secure connection and watertight seal around the steel posts, you can help reduce the risk of water damage and potential balcony failure. This can significantly improve the overall safety of the balcony and contribute to adhering to OSHA (Occupational Safety and Health Administration) regulations regarding guardrail strength and stability during construction.

Q: Are there any drawbacks to consider with this approach?


A: While there are advantages, it's important to be aware of some potential considerations:


  • Communication and Planning: Clear communication and project planning are crucial. The waterproofing contractor needs to be involved early on to understand the post locations and ensure their waterproofing plan integrates seamlessly with the steel railing installation.

Overall, installing steel balcony railings before waterproofing can be a viable and efficient approach, especially when prioritizing a secure connection, watertight system, and improved safety that aligns with OSHA compliance. However, open communication and proper planning are key for a successful outcome.


Additional Notes:


  • It's important to consult with qualified professionals, including structural engineers and waterproofing specialists, to ensure the chosen method complies with local building codes and best practices for your specific project.

  • While some might argue about the increased complexity for waterproofing around posts, a skilled contractor can effectively address this challenge.

By carefully considering these factors and involving the right professionals, you can achieve a secure, waterproof, and OSHA-compliant balcony with steel railings on your wood-framed building.

1 view

Comments


Commenting has been turned off.
bottom of page